Azertica
AZERTICA

A proposal prepared exclusively for ANKA

Audit, redesign & digital partnership for the ANKA marketplace. This document is confidential. Enter the access code you received to continue.

That code isn't right. Please try again.
Welcome, ANKA
Taking you to your proposal…
CONFIDENTIAL · AZERTICA × ANKA · AUGUST 2026
Azertica
Confidential · prepared for ANKA Contact
Mission Proposal · August 6, 2026 · Confidential

Audit, Redesign & Digital Partnership for the ANKA Marketplace

Understand exactly how the audit works, then choose your level of engagement, from a standalone diagnostic to a full rebuild supported over six months.

PLAN 1 · $4,200
Audit only
Complete diagnostic of the current site
PLAN 2 · $9,000
Recommended
Audit + Design + Development
Diagnostic, then the new site, designed and built
PLAN 3 · $11,700
+ 6-Month Maintenance
Everything in Plan 2, supported over time
Prepared for
ANKA leadership & product team
Prepared by
Azertica · Mamadou · contact@azertica.com
Date
August 6, 2026
Section 01

Preliminary Findings

While preparing this proposal, we ran a quick exploratory review of the French version of the public site. It doesn't replace a full audit, but it illustrates the kind of findings, and the potential gains, that a structured process would quantify across the whole catalog and purchase funnel. A preliminary Lighthouse run on the marketplace's mobile experience already puts numbers on the technical side:

Measured Baseline: Lighthouse (Mobile)

37
Performance
84
Accessibility
69
Best Practices
69
SEO
5.8 s
Largest paint
4.9 s
First paint
18.1 s
Speed index
1,060 ms
Blocking time
0.007
Layout shift
Biggest measured opportunities
Render-blocking requests · est. 1,570 ms Unused JavaScript · est. 4,405 KiB Inefficient cache lifetimes · est. 1,213 KiB Image delivery · est. 446 KiB JS execution time · 5.6 s
High risk
Dead link from the main hero banner
The homepage's "Gala season" hero banner links to a collection page that shows "0 products, no results."
Lost conversion on the site's single most visible entry point.
Medium risk
Missing visuals in several sections
The "Sales" and "Featured creator" blocks show empty or black zones, with no product image or creator portrait.
Degraded brand image; the site feels unfinished.
Medium risk
Mixed languages on the French experience
The main CTA reads "SELL ON ANKA" in English, the chat widget opens in English, and most product titles in a visited category are written in English.
Confusion and lost trust for French-speaking users.
Medium risk
Leftovers of the old brand name
The "Jewelry" category description ends with "…all tastes, sizes and colors are on Afrikrea!", Afrikrea being ANKA's name before its rebrand.
Brand inconsistency and a poor signal for SEO.
Medium risk
Blurred catalog positioning
In the observed category, nearly every listing is labeled "Sponsored", with many wholesale lots (30–50 pieces) at high prices mixed in with retail items.
Dilutes the "premium diaspora fashion marketplace" positioning.
These five issues were found in a few minutes of manual browsing, with no access to internal tools (analytics, back office, Search Console). The full audit described in section 02 deepens, quantifies and extends them across the entire site: category pages, product pages, checkout, mobile, and the seller area.
Section 02

Understanding the Audit: the Scope

A 360° review organized around six complementary axes, covering ANKA's full web presence: the marketplace (marketplace.anka.africa) and the corporate site (anka.africa).

AXIS 1

UX / UI & User Journeys

  • Information architecture and navigation (desktop & mobile)
  • End-to-end purchase funnel: search → product page → cart → checkout → confirmation
  • Accessibility and secondary journeys (become a creator, favorites, account)
AXIS 2

Technical & Performance

  • Load times and Core Web Vitals (desktop & mobile), via standard performance tooling
  • Systematic detection of dead links, empty pages and errors through a full site crawl
  • Baseline security (HTTPS, security headers) and scalability against the catalog's volume
AXIS 3

SEO & Visibility

  • Indexation, URL structure, internal linking and structured data (schema.org)
  • Content quality and uniqueness, multilingual keyword strategy (FR / EN / additional markets)
  • Leveraging press coverage (Elle, Forbes, BBC Africa, Le Monde) in the netlinking strategy
AXIS 4

Content & Brand Consistency

  • Language consistency (FR/EN) across all journeys, including product pages
  • Rebranding leftovers, typos, repetitions, consistency of visual templates
  • Fit between editorial tone and the "premium diaspora" positioning
AXIS 5

Security & Trust

  • Clarity of guarantees (secure payment, return policy), credibility of customer reviews
  • Transparency of seller profiles, legal notices, terms & conditions
  • Personal-data compliance (GDPR and regional equivalents)
AXIS 6

Conversion & Business Performance

  • Catalog analysis (share of sponsored listings, wholesale/retail mix, price consistency)
  • Conversion-funnel analysis and benchmark against 2–3 competing marketplaces
  • Prioritization of recommendations by estimated business impact

The Audit, Step by Step

What Azertica does, what we need from ANKA, and what comes out of each phase.

{{ ph.n }}

{{ ph.title }}

Objective
{{ ph.objective }}
Azertica
{{ ph.azertica }}
ANKA provides
{{ ph.anka }}
Output
{{ ph.output }}

Deliverables and Timeline

What ANKA receives, and on what rhythm.

DeliverableContents
Detailed audit report (PDF)Findings organized by axis, illustrated with annotated screenshots, with a severity level for every item.
Impact / Effort prioritization matrixEvery recommendation positioned to make product trade-offs easy.
3 / 6 / 12-month roadmapA sequenced action plan: immediate quick wins and structural projects.
Executive readout (slides) + workshopAn executive summary for leadership, then a 1.5–2 hour workshop with the teams.

Why 4 Weeks?

The duration isn't arbitrary: it reflects the real scale of the site rather than a quick pass over the homepage. The catalog is vast: the Jewelry category alone counts more than 5,000 listings across 85 pages, out of nine main categories. That requires sampling across several categories so that content findings (mixed languages, rebrand leftovers, product-page consistency) are representative, not anecdotal. On top of that, several distinct journeys need detailed testing: buyer, seller/creator, account management, plus multi-currency delivery and payment to more than 175 countries.

The timeline still holds at 4 weeks because phases run in parallel rather than one after another: technical/SEO and UX/UI start together (weeks 1–2), then content, security and the competitive benchmark also advance side by side (weeks 2–3). This is a representative, rigorous audit, built on statistical sampling of the catalog rather than checking every listing one by one.

4 weeks is the default calibration for the scope in this section. A lighter pass focused on the busiest journeys can fit in 3 weeks; rigorous coverage of every category, several countries/currencies and a full mobile-testing campaign would realistically take 5–6 weeks. This is adjusted with ANKA at kickoff (Phase 0).

Audit Timeline: 4 Calendar Weeks

W1W2W3W4
{{ g.label }}
This timeline applies to the audit included in all 3 plans. Phases 1–2 and 3–5 run in parallel to hold the 4 weeks.
Section 03

From Audit to Action: the Technical Pivot Point

Once the audit is delivered (Phase 7), one central question drives Plans 2 and 3: should ANKA be rebuilt on a new technical platform, or should the design and key journeys be redone on the current one? That decision can't be made before the audit; it depends directly on what Phases 1 (technical) and 4 (security) reveal: accumulated technical debt, limits of the current platform, maintenance cost, and the ability to fix the structural issues seen in section 01 at the root.

STEP 1
Audit
4 weeks
STEP 2
Readout & technical framing meeting
The decision point
Option A: Full rebuild
Option B: Redesign on the existing platform
Option A: Full Rebuild

ANKA starts over on a new technical architecture, a new design system and new front/back development. Heavier in time and investment, this option fixes structural problems at the root rather than working around them, and keeps today's technical debt from limiting future evolution.

Option B: Redesign on the Existing Platform

ANKA keeps its current platform, and Azertica redesigns and redevelops the priority screens and journeys on top of it. Faster and less costly, this option's limit is that it keeps some technical constraints of the current platform.

Both options lead to the same Design and Development phases; only their precise technical content and duration differ. This proposal deliberately doesn't decide between them in advance: duration and investment estimates for Design and Development are given as ranges, and are finalized at the technical framing meeting that follows the audit readout.

Section 04

The 3 Plans at a Glance

A quick overview to orient the choice; each plan is then detailed separately below.

What's included Plan 1
Audit only
Plan 2 Recommended
+ Design + Development
Plan 3
+ 6-month maintenance
Full 6-axis audit, roadmap, readout (section 02)
Post-audit technical framing meeting (Option A / B, section 03)
UX/UI design, prototyping & development of the new site
6 months of evolving maintenance + monthly reporting
Estimated total duration≈ 4 weeks≈ 4–6 months*≈ 10–12 months*
Price (fixed fee)$4,200$9,000$11,700

Fixed fees, priced in USD. * Duration finalized after the technical framing meeting (section 03); it depends on the option chosen: full rebuild or redesign on the existing platform.

Section 05 · Plan 1

Plan 1: Audit Only

A complete, actionable diagnostic of the current site, to decide calmly whether a redesign should follow. No commitment on the next phases.

$4,200
≈ 24 person-days
Included in this plan
  • Full audit of the 6 axes (UX/UI, technical & performance, SEO, content & brand, security & trust, conversion)
  • Detailed audit report (PDF), annotated screenshots, severity level per finding
  • Impact / Effort prioritization matrix
  • 3 / 6 / 12-month roadmap
  • Executive readout (leadership slides) + 1.5–2h workshop with the teams
Not included
  • Technical framing meeting (full rebuild vs redesign on the existing platform)
  • UX/UI design and development of the new site
  • Maintenance or support after the readout
These are available in Plans 2 and 3.
Duration
Audit: 4 weeks, ending with the readout. See section 02 for the phase-by-phase timeline.
Team on the mission
RoleResponsibility
Mission lead / senior consultantOverall steering, synthesis and presentation to ANKA leadership
UX/UI consultant & auditorAudit of journeys and navigation
Technical & SEO expertPerformance, baseline-security and search audit
Conversion & data analystCatalog and funnel analysis, competitive benchmark
Start with the diagnostic, decide on the rest after the readout.
Choose this plan →
Section 06 · Plan 2
Recommended

Plan 2: Audit + Design + Development

Everything in Plan 1, followed by the design and construction of the new site, on a new platform or on the existing one, depending on the decision from the audit (section 03).

$9,000
≈ 83–118 person-days
Included in this plan
  • Everything in Plan 1 (full audit, report, roadmap, readout)
  • Post-audit technical framing meeting (Option A / B choice, section 03)
  • UX/UI design: sitemap, wireframes, design system, high-fidelity mockups
  • Interactive prototyping & iterative validation with ANKA's teams
  • Front/back development, data migration, multi-device QA testing
  • Progressive deployment & training of ANKA's teams
Not included
  • Maintenance after go-live
  • Continuous monthly performance reporting
These are available in Plan 3.
Duration: ≈ 21 weeks (≈ 4–6 months)
Audit 4 wk Framing 1 wk Design 4–6 wk Development 8–14 wk
Median scenario, refined after the technical framing meeting.
What the Design phase covers
  • Design workshops turning audit findings into design principles; redesigned sitemap and navigation
  • Wireframes of the priority journeys (home, search/category, product page, cart, checkout, seller profile)
  • Design system (palette, typography, reusable components) ensuring consistency across the whole catalog
  • High-fidelity desktop & mobile mockups, interactive prototype, 2–3 validation checkpoints with ANKA's teams
What the Development phase covers
  • Front-end development of the journeys and components validated in Design
  • Back-end development or adaptation (catalog, payment, seller management, FR/EN language consistency)
  • Integration of the fixes identified in the audit (dead links, obsolete content leftovers, language inconsistencies)
  • Multi-browser and multi-device QA, migration of existing data and catalog
  • Progressive deployment (staging then production) and training of ANKA's teams
Team on the mission
Mission lead / senior consultantOverall steering, trade-offs, presentations to ANKA leadership
UX/UI consultant & auditorJourney audit, then UX design in the Design phase
Technical & SEO expertTechnical audit, leads the technical framing meeting
Conversion & data analystCatalog and funnel analysis, competitive benchmark
UI/UX designerHigh-fidelity mockups, design system, prototyping
Front-end & back-end developersJourney development, integration, data migration
QA / testing leadMulti-browser and multi-device testing before production
Effort breakdown (indicative)
Audit (6 axes, roadmap, readout)24 days
Technical framing meeting2 days
Design (workshops, wireframes, design system, mockups, prototype)15–20 days
Development (front/back, migration, QA, deployment, training)40–70 days
Total estimated≈ 83–118 days
Development effort depends on the option chosen at the framing meeting (section 03).
The diagnostic, then the new ANKA: designed, built and shipped.
Choose this plan →
Section 07 · Plan 3

Plan 3: Audit + Design + Development + 6-Month Maintenance

Everything in Plan 2, extended by 6 months of post-launch support, to secure the impact of the changes and keep the site alive over time.

$11,700
Included in this plan
  • Everything in Plan 2 (audit, technical framing, design, development, deployment, training)
  • Evolving maintenance for 6 months: corrective support, monitoring, monthly new features, security updates
  • Monthly performance reporting (traffic, conversion, incidents handled)
  • Monthly progress call with ANKA's teams (video, 45–60 minutes)
  • Wrap-up workshop at the end of the 6 months
Not included
  • Commitment beyond the 6 months of maintenance, renewable or adjustable after the wrap-up workshop
Duration: ≈ 47 weeks (≈ 10–12 months)
Audit Framing Design Development Maintenance (6 months)
Median scenario, 6-month maintenance starting at go-live.
Effort breakdown (indicative)
Audit, framing, Design, Development (same as Plan 2)83–118 days
Evolving maintenance (≈ 8–10 days/month × 6 months)48–60 days
Total estimated≈ 131–178 days
What the 6-month evolving maintenance covers
Corrective support
Bug and incident fixes post-launch, with an agreed response time (SLA).
Monitoring & hosting
Availability and performance monitoring of the site.
Evolving maintenance
A monthly budget of hours for new features, optimizations or adjustments (e.g. a new filter, SEO tuning of a category).
Security updates
Regular security patches and updates.
Monthly reporting
Traffic, conversion rate, incidents handled, adjustment recommendations.
Evolving maintenance differs from purely corrective maintenance: beyond incident resolution, it includes a dedicated monthly budget for continuous improvements, rather than just "fixing what breaks."
The complete plan: built, shipped, and supported over time.
Choose this plan →

Plans 1, 2 and 3 are fixed fees, priced in USD. Person-day breakdowns are indicative, to illustrate the relative scale of each plan.

Section 08

Next Steps

How to get started, whichever plan you choose.

1
Choose a plan
Audit only, Audit + Design + Development, or the full plan with 6-month maintenance. You can start with Plan 1 and decide on the rest after the readout, with no prior commitment to the later phases.
2
Validate scope and timeline
A working session with ANKA's teams to confirm the chosen axes and adjust the schedule if needed.
3
Sign the engagement letter
Formalizing the terms (scope, timeline, investment) between Azertica and ANKA.
4
Open the accesses
Analytics, Search Console, read access to the back office and catalog.
5
Kickoff
A launch meeting with ANKA's stakeholders to align objectives and target KPIs.

Ready to Start?

Azertica remains available to adjust this proposal (chosen plan, scope, timeline or budget) to ANKA's priorities.